Assignment 2 Financial Project

In: Other Topics

Submitted By jrzygirl73
Words 290
Pages 2
Assignment 2: Financial Project

Due Week 7 and worth 55 points

Five (5) years ago, you bought a house for $171,000, with a down payment of $30,000, which meant you took out a loan for $141,000. Your interest rate was 5.75% fixed. You would like to pay more on your loan. You check your bank statement and find the following information:

Escrow payment

$261.13

Principle and Interest payment

$822.84

Total Payment

$1,083.97

Current Loan Balance

$130,794.68

Write a one to two (1-2) page paper in which you address the following:

Part 1

With your current loan, explain how much additional money you would need to add to your monthly payment to pay off your loan in 20 years instead of 25. Decide whether or not it would be reasonable to do this if you currently meet your monthly expenses with less than $100 left over.

(a) Explain your strategy for solving the problem. (b) Present a step-by-step solution of the problem. (c) Clearly state your answer to Part 1. What is your decision?

Part 2

Identify the highest interest rate you could refinance at in order to pay the current balance off in 20 years and determine the interest rate, to the nearest quarter point, that would require a monthly total payment that is less than your current total payment. The interest rate that you qualify for will depend, in part, on your credit rating. Also, refinancing costs you $2,000 up front in closing costs.

(a) Explain your strategy for solving the problem. (b) Present a step-by-step solution of the problem. (c) Clearly state your answer to Part 2. What is your…...

Similar Documents

Financial Management Assignment 2

...Assignment 1 MBA – 622 Financial Management Muhieddine Itani U121N0314 Part A: Morello Landscapes Limited Cash Budget | For the period: January 1st 2012 to June 31st 2012 | Worksheet | | | | | | | | January | February | March | April | May | June | | € | € | € | € | € | € | Sales (Price of the contract) | 400,000 | | | | | | Collections: | 5% | 15% | 10% | 10% | 10% | 50% | Cash | 20,000 | 60,000 | 40,000 | 40,000 | 40,000 | 200,000 | Accounts Receivable | 2,400 |   |   |   |   |   | Total Collections | 22,400 | 60,000 | 40,000 | 40,000 | 40,000 | 200,000 | | | | | | | | Purchases | | | | | | | Payments: | | | | | | | Accounts Payable | | | | | | | Materials | 6,600 | | | | | | Miscellaneous | 2,570 | | | | | | Materials | | | | | | | Soil | 12,600 | | | | | | Sand | | | 2,200 | | | | Cement | | | | 3,100 | | | Bricks/stones | | | | | | 76,500 | Turf (10%) | | | | | | 43,200 | Shrubs(10%) | | | | | | 16,700 | Other materials | 2,000 | 2,000 | 2,000 | 2,000 | 2,000 | 2,000 | Total payments | 23,770 | 2,000 | 4,200 | 5,100 | 2,000 | 138,400 | | | | | | | | | | | | | | | Inflows & Outflows | | | | | | | Collections | 22,400 | 60,000 | 40,000 | 40,000 | 40,000 | 200,000 | Returned Deposit for diggers | | 2,500 | | | |......

Words: 805 - Pages: 4

Bus 517 Assignment 2 - Project Scope

...BUS 517 Assignment 2 - Project Scope Click Link Below To Download: http://strtutorials.com/BUS-517-Assignment-2-Project-Scope-BUS5172.htm This assignment builds on Assignment 1 to provide the necessary scope for your project. A project scope includes many variables, the Work Breakdown Structure (WBS) that must be defined prior to the start of the project to ensure that all of the details are planned. In the form of an Excel spreadsheet, Word table, project-specific software, etc., prepare a checklist document that identifies the critical steps in planning the project scope and complete the checklist in accordance with your project. Provide an explanation for how the project scope checklist should be used to thoroughly document the project. Create a 3-4 page project scope checklist in which you: Define the scope of the project in terms of the following: Outcomes, objectives, and deliverables Key functionality required within the new system Primary stakeholders Assess the current situation and future situation that will be most impacted by the project. Prepare a quantifiable project statement. Document three (3) assumptions associated with the project. Explain the uses for the project checklist and how it should be applied to this and future projects. Your assignment must follow these formatting requirements: Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; references must follow APA......

Words: 343 - Pages: 2

Assignment 2 Project Motorcycle

...Assignment #2: “Project Motorcycles” Jesse Fontanez BUS 375 – Project Management Professor Lodge November 2, 2014 New, Improved, Faster, Motorcycle Project Plan The implementation stages of motorcycles larger than 1100 cc project is a true display of the defining moments that make a project a success or a failure. The implementation stage is defined as "motorcycle modifications being installed and made operational in a production environment. The phase is initiated after the motorcycles has been tested and accepted. This phase continues until the system is operating in production in accordance with the defined motorcycle requirements”. While all of the planning that takes place in preparation of the implementation phase is critical, I am of the opinion that the implementation itself is equally as important. When working through the process of defining the motorcycle and selecting the organizational personnel to create this motorcycle systems, the beginning stages become the most important part of the motorcycle project for this organization. A tremendous effort has to be exuded in planning and preparation for the motorcycle development and deployment. The start of the motorcycle implementation phase is indication that progress was being made and the motorcycles are well underway. Before analyzing the process of project planning in teams it is necessary to identify the differences between such terms as a group of people and a team...

Words: 1673 - Pages: 7

Bus 517 Assignment 2 - Project Scope

...BUS 517 Assignment 2 - Project Scope Click Link Below To Download: http://strtutorials.com/BUS-517-Assignment-2-Project-Scope-BUS5172.htm This assignment builds on Assignment 1 to provide the necessary scope for your project. A project scope includes many variables, the Work Breakdown Structure (WBS) that must be defined prior to the start of the project to ensure that all of the details are planned. In the form of an Excel spreadsheet, Word table, project-specific software, etc., prepare a checklist document that identifies the critical steps in planning the project scope and complete the checklist in accordance with your project. Provide an explanation for how the project scope checklist should be used to thoroughly document the project. Create a 3-4 page project scope checklist in which you: Define the scope of the project in terms of the following: Outcomes, objectives, and deliverables Key functionality required within the new system Primary stakeholders Assess the current situation and future situation that will be most impacted by the project. Prepare a quantifiable project statement. Document three (3) assumptions associated with the project. Explain the uses for the project checklist and how it should be applied to this and future projects. Your assignment must follow these formatting requirements: Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; references must follow APA......

Words: 343 - Pages: 2

Financial Accounting Assignment 2

...00 (b) Consolidated Statement of Financial Position for Ker Inc(Dec 31, 20X6): (i)Property Plant and Equipment(net)(2200000+3500000-140000+20000) (ii)Inventory(1400000+200000-225000) (iii)Deferred Tax Liability(500000+300000-35000-78750) (c ) Investment in Meagan Co, Dec 31, 20X6, Cost method 3,000,000.00 Meagan Co. Retained Earnings Dec 31, 20X6 3,000,000.00 Meagan Co. Retained Earnings at Acquisition Date 2,000,000.00 5,580,000.00 1,375,000.00 686,250.00 Investment Account, Dec 31, 20X6 - Equity Method Increase in Retained Earnings of Meagan Co 1,000,000.00 Ker's % Ownership 80% 800,000.00 Less: NCI's Share of Acquisition Differential (-100000x80%) (80,000.00) Less: Meagans intercompany profits(146250+65000)x80% 169,000.00 Investment in Meagan(Equity Method) 3,711,000.00 Question 2 (a) Proprietary Theory Calculation of Acquisition Differential: Cost of 72% Investment in S Company 6,960 Carrying Amount of S Company's Net Assets Assets 13,500 Liabilities 4,500 9,000 P Company's Ownership 72% 6,480 Acquisition Differential 480 Allocated: FV-CA % Inventory 150 72% 108 Plant and Equipment (900) 72% (648) (540) Goodwill 1,020 Non controlling Interest 0 Consolidate Statement of Financial Position P Company Dec 31,......

Words: 1700 - Pages: 7

Bus 517 Assignment 2 – Project Scope

...BUS 517 Assignment 2 – Project Scope Click Link Below To Buy: http://hwcampus.com/shop/bus-517/bus-517-assignment-2-project-scope/ Or Visit www.hwcampus.com BUS 517 Assignment 2 – Project Scope This assignment builds on Assignment 1 to provide the necessary scope for your project. A project scope includes many variables, the Work Breakdown Structure (WBS) that must be defined prior to the start of the project to ensure that all of the details are planned. In the form of an Excel spreadsheet, Word table, project-specific software, etc., prepare a checklist document that identifies the critical steps in planning the project scope and complete the checklist in accordance with your project. Provide an explanation for how the project scope checklist should be used to thoroughly document the project. Create a 3-4 page project scope checklist in which you: Define the scope of the project in terms of the following: Outcomes, objectives, and deliverables Key functionality required within the new system Primary stakeholders Assess the current situation and future situation that will be most impacted by the project. Prepare a quantifiable project statement. Document three (3) assumptions associated with the project. Explain the uses for the project checklist and how it should be applied to this and future projects. Your assignment must follow these formatting requirements: Be typed, double spaced, using Times New Roman font (size 12), with one-inch......

Words: 355 - Pages: 2

Bus 517 Assignment 2 – Project Scope

...BUS 517 Assignment 2 – Project Scope Click Link Below To Buy: http://hwcampus.com/shop/bus-517/bus-517-assignment-2-project-scope/ Or Visit www.hwcampus.com BUS 517 Assignment 2 – Project Scope This assignment builds on Assignment 1 to provide the necessary scope for your project. A project scope includes many variables, the Work Breakdown Structure (WBS) that must be defined prior to the start of the project to ensure that all of the details are planned. In the form of an Excel spreadsheet, Word table, project-specific software, etc., prepare a checklist document that identifies the critical steps in planning the project scope and complete the checklist in accordance with your project. Provide an explanation for how the project scope checklist should be used to thoroughly document the project. Create a 3-4 page project scope checklist in which you: Define the scope of the project in terms of the following: Outcomes, objectives, and deliverables Key functionality required within the new system Primary stakeholders Assess the current situation and future situation that will be most impacted by the project. Prepare a quantifiable project statement. Document three (3) assumptions associated with the project. Explain the uses for the project checklist and how it should be applied to this and future projects. Your assignment must follow these formatting requirements: Be typed, double spaced, using Times New Roman font (size 12), with one-inch......

Words: 355 - Pages: 2

Financial Accounting Chapter 2 Assignment

...CHAPTER 2: Recording Process ( SWD: Lecture Review) What is an account? An account is an accounting record of increases and decreases in a specific asset, liability, or owner’s equity item. For example, Softbyte (the company discussed in Chapter 1) would have separate accounts for Cash, Accounts Receivable, Accounts Payable, Service Revenue, and Salaries Expense. In its simplest form, an account consists of three parts: (1) a title, (2) a left or debit side, and (3) a right or credit side. Because the format of an account resembles the letter T, we refer to it as a T account. Debits and Credits The terms debit and credit are directional signals: Debit indicates left, and credit indicates right.They indicate which side of a T account a number will be recorded on. Entering an amount on the left side of an account is called debiting the account. Making an entry on the right side is crediting the account.We commonly abbreviate debit as Dr. and credit as Cr. Double-entry accounting system • Each transaction must affect two or more accounts to keep the basic accounting equation in balance. • Recording done by debiting at least one account and crediting another. • DEBITS must equal CREDITS. If Debits are greater than Credits, the account will have a debit balance. If Credits are greater than Debits, the account will have a credit balance. The normal balance of an account is on the side where an increase in the account is recorded. The Journal Companies initially record......

Words: 1276 - Pages: 6

Bus 517 Assignment 2 – Project Scope

...BUS 517 Assignment 2 – Project Scope Click Link Below To Buy: http://hwcampus.com/shop/bus-517/bus-517-assignment-2-project-scope/ Or Visit www.hwcampus.com BUS 517 Assignment 2 – Project Scope This assignment builds on Assignment 1 to provide the necessary scope for your project. A project scope includes many variables, the Work Breakdown Structure (WBS) that must be defined prior to the start of the project to ensure that all of the details are planned. In the form of an Excel spreadsheet, Word table, project-specific software, etc., prepare a checklist document that identifies the critical steps in planning the project scope and complete the checklist in accordance with your project. Provide an explanation for how the project scope checklist should be used to thoroughly document the project. Create a 3-4 page project scope checklist in which you: Define the scope of the project in terms of the following: Outcomes, objectives, and deliverables Key functionality required within the new system Primary stakeholders Assess the current situation and future situation that will be most impacted by the project. Prepare a quantifiable project statement. Document three (3) assumptions associated with the project. Explain the uses for the project checklist and how it should be applied to this and future projects. Your assignment must follow these formatting requirements: Be typed, double spaced, using Times New Roman font (size 12), with one-inch......

Words: 355 - Pages: 2

Cis 517 Wk 2 Assignment 1 It Project

...CIS 517 WK 2 ASSIGNMENT 1 IT PROJECT To purchase this visit here: http://www.activitymode.com/product/cis-517-wk-2-assignment-1-it-project/ Contact us at: SUPPORT@ACTIVITYMODE.COM CIS 517 WK 2 ASSIGNMENT 1 IT PROJECT CIS 517 WK 2 Assignment 1 - IT Project Management Assessment Research and read an article on recent recipients of the Project Management Institute’s Project of the Year Award. Write a two to three (2-3) page paper in which you: 1. Summarize how the project manager or team exhibited exceptional and ethical project management practices. 2. Discuss the role of the project manager or team, the organizational setting, the recipient’s approach to project integration management, and obstacles that had the potential of adversely impacting the triple constraints. More Details hidden... Activity mode aims to provide quality study notes and tutorials to the students of CIS 517 WK 2 Assignment 1 IT Project in order to ace their studies. CIS 517 WK 2 ASSIGNMENT 1 IT PROJECT To purchase this visit here: http://www.activitymode.com/product/cis-517-wk-2-assignment-1-it-project/ Contact us at: SUPPORT@ACTIVITYMODE.COM CIS 517 WK 2 ASSIGNMENT 1 IT PROJECT CIS 517 WK 2 Assignment 1 - IT Project Management Assessment Research and read an article on recent recipients of the Project Management Institute’s Project of the Year Award. Write a two to three (2-3) page paper in which you: 1. Summarize how the project manager or team exhibited exceptional and......

Words: 633 - Pages: 3

Bus 517 Assignment 2 – Project Scope

...BUS 517 Assignment 2 – Project Scope Click Link Below To Buy: http://hwcampus.com/shop/bus-517/bus-517-assignment-2-project-scope/ Or Visit www.hwcampus.com BUS 517 Assignment 2 – Project Scope This assignment builds on Assignment 1 to provide the necessary scope for your project. A project scope includes many variables, the Work Breakdown Structure (WBS) that must be defined prior to the start of the project to ensure that all of the details are planned. In the form of an Excel spreadsheet, Word table, project-specific software, etc., prepare a checklist document that identifies the critical steps in planning the project scope and complete the checklist in accordance with your project. Provide an explanation for how the project scope checklist should be used to thoroughly document the project. Create a 3-4 page project scope checklist in which you: Define the scope of the project in terms of the following: Outcomes, objectives, and deliverables Key functionality required within the new system Primary stakeholders Assess the current situation and future situation that will be most impacted by the project. Prepare a quantifiable project statement. Document three (3) assumptions associated with the project. Explain the uses for the project checklist and how it should be applied to this and future projects. Your assignment must follow these formatting requirements: Be typed, double spaced, using Times New Roman font (size 12), with one-inch......

Words: 355 - Pages: 2

Bus 517 Assignment 2 – Project Scope

...BUS 517 Assignment 2 – Project Scope Click Link Below To Buy: http://hwcampus.com/shop/bus-517/bus-517-assignment-2-project-scope/ Or Visit www.hwcampus.com BUS 517 Assignment 2 – Project Scope This assignment builds on Assignment 1 to provide the necessary scope for your project. A project scope includes many variables, the Work Breakdown Structure (WBS) that must be defined prior to the start of the project to ensure that all of the details are planned. In the form of an Excel spreadsheet, Word table, project-specific software, etc., prepare a checklist document that identifies the critical steps in planning the project scope and complete the checklist in accordance with your project. Provide an explanation for how the project scope checklist should be used to thoroughly document the project. Create a 3-4 page project scope checklist in which you: Define the scope of the project in terms of the following: Outcomes, objectives, and deliverables Key functionality required within the new system Primary stakeholders Assess the current situation and future situation that will be most impacted by the project. Prepare a quantifiable project statement. Document three (3) assumptions associated with the project. Explain the uses for the project checklist and how it should be applied to this and future projects. Your assignment must follow these formatting requirements: Be typed, double spaced, using Times New Roman font (size 12), with one-inch......

Words: 355 - Pages: 2

Bus 517 Assignment 2 – Project Scope

...BUS 517 Assignment 2 – Project Scope Click Link Below To Buy: http://hwcampus.com/shop/bus-517/bus-517-assignment-2-project-scope/ Or Visit www.hwcampus.com BUS 517 Assignment 2 – Project Scope This assignment builds on Assignment 1 to provide the necessary scope for your project. A project scope includes many variables, the Work Breakdown Structure (WBS) that must be defined prior to the start of the project to ensure that all of the details are planned. In the form of an Excel spreadsheet, Word table, project-specific software, etc., prepare a checklist document that identifies the critical steps in planning the project scope and complete the checklist in accordance with your project. Provide an explanation for how the project scope checklist should be used to thoroughly document the project. Create a 3-4 page project scope checklist in which you: Define the scope of the project in terms of the following: Outcomes, objectives, and deliverables Key functionality required within the new system Primary stakeholders Assess the current situation and future situation that will be most impacted by the project. Prepare a quantifiable project statement. Document three (3) assumptions associated with the project. Explain the uses for the project checklist and how it should be applied to this and future projects. Your assignment must follow these formatting requirements: Be typed, double spaced, using Times New Roman font (size 12), with one-inch......

Words: 355 - Pages: 2

Hum 112 Assignment 2: Project Paper

...HUM 112 Assignment 2: Project Paper To Buy this Class Copy & paste below link in your Brower http://homeworkregency.com/downloads/hum-112-assignment-2-project-paper/ Or Visit Our Website Visit : http://www.homeworkregency.com Email Us : homeworkregency@gmail.com HUM 112 Assignment 2: Project Paper Assignment 2: Project Paper Due Week 8 and worth 200 points The Project Paper focuses on a suggested topic related to art, architecture, history, music, or literature. The project will reflect your views and interpretation of the topic. This project is designed to help you stretch your mind and your abilities to be the creative, innovative, and critical thinker you already are! Choose one (1) of the topics from the list of topic choices below. Read the topic carefully. Write a three to four (3-4) page paper (750-1,000 words) that responds to each of the items described in the topic. Harlem Renaissance Poets. Essay & Poem. Choose two (2) poems by different authors from the Harlem Renaissance. Write an essay that: 1. Describes each author’s role and importance within the Harlem Renaissance. 2. Identify the elements in each of their poems in which you see evidence of the “double-consciousness” being expressed by each author. 3. Fully describe at least two (2) primary themes you see in the poetry written during this time period, referring to specific lines in each of the poems. 4. Write your own poem that expresses these identified themes of the Harlem......

Words: 543 - Pages: 3

Assignment 1: Financial Project

...Assignment 1: Financial Project Assignment 1: Financial Project Five years ago, you bought a house for $151,000.00 with a down payment of $30,000, which meant you took a loan for $121,000.00. Your interest rate was 5.75% fixed. You would like to pay more on your loan. You check your bank statement and find the following information: Escrow Payment: $211.13 Principle And Interest Payment: $706.12 Total Payment: $917.25 Current Loan Balance: $112,242.47 Explain how much additional money you would need to add to your monthly payment to pay off your loan in 20 years instead of 25 years. If you took 25 years to pay off your loan the monthly payment would be $761.22 per month. If it took 20 years to pay off your loan the monthly payments would be $849.52 per month. So if you wanted to pay off the loan in 20 years you would need to raise your total monthly payment by $88.30 per month. Explain whether or not it would be reasonable to do this if you currently meet your monthly expenses with less than $100.00 left over. Yes you would be able to meet your monthly expenses. Again, if the monthly payment is only $88.30 over your normal payment and you have less than $100.00 left over than you could make the additional monthly payment. But that would not leave much money left over after you made the additional monthly payment. It might be possible to pay the current balance off in 20 years if you refinanced the loan at a lower interest rate. The......

Words: 593 - Pages: 3