Proj598 Rfp 3

In: Business and Management

Submitted By jennmitchell83
Words 1306
Pages 6
Hotel Rooms for FESAC Meeting for U.S. Census Bureau

A proposal by
DC Hotel and Suites
Solicitation #: CENSUS_VLT-13-HOTEL
Contract Award Date: April 18, 2013
April 14, 2013

DC Hotel & Suites
1291 Alabama Avenue SE
Washington, District of Columbia 20233
+1 301 555 5555

Prepared by: Jennifer Mitchell jennifer.mitchell@dchotel.com DC Hotel & Suites
1291 Alabama Avenue SE
Washington, District of Columbia 20233
April 14, 2013

Victor Levi Thomas
Contract Specialist
U.S. Census Bureau
4600 Silver Hill Road
Suitland, Maryland 20746
Dear Mr. Thomas:
Attached is our bid for the Hotel Rooms for FESAC Meeting, Solicitation Number: CENSUS_VLT-13-HOTEL.
This bid assumes that if granted all necessary arrangements will be made no later than 30 days prior to the FESAC meeting. This bid is also based on information provided at this time. Any revisions required at a later date will be subject to price review at that time. If there is anything you have questions about please contact me any time.
Thank you for giving us this opportunity. We look forward to hearing from you.
Sincerely,
Jennifer Mitchell
Hotel Manager
Enclosure

Contents
Technical Approach 4 Introduction 4 General Description 4 Capacity 4 Goals 4 Description 4 Cost 5 Other Amenities 5
Personnel Qualifications 6
References 7
Team Partners 8
Capabilities and Partner Capabilities 8
Works Cited 10

Technical Approach
Introduction
DC Hotel & Suites is the perfect place for your members to enjoy their stay throughout the FESAC meeting. We are dedicated to satisfying our customers every need throughout their stay. We offer Federal Travel Regulation (FTR) complaint rooms for many different government employees while on official business.
General Description
The hotel is located in ideal location near a metro station as well as near many of the…...

Similar Documents

Proj598

...TABLE OF CONTENTS 1. INSTRUCTIONS TO BIDDERS 4 1.1. General Description of Work 4 1.2. What Must Be Included with Bid 4 1.3. Schedule of Bid Period Activities 4 1.4. Location of Work 5 1.5. Pre-Bid Meeting 5 1.6. Owner Contact for Questions 5 1.7. Pre-Award Surveys 5 1.8. Sealed Bid Requirements 5 1.9. Basis for Bid Evaluation 6 1.10. Ethical Standards 6 1.11. Responsibility for Surety Bonds 6 1.12. Proposal Format 6 1.13. List of Bidders 6 1.14. Letter of Acknowledgment 6 2. DESCRIPTION OF WORK 7 2.1. Engineering Contracts 7 2.2. Construction Contracts 8 3. PROPOSAL 8 3.1. Breakdown of Bid Price 9 3.2. Revisions and Extra Work 9 3.3. Escalation Formulas 9 3.4. Scheduled Completion Dates 9 3.5. List of Subcontractors 9 3.6. Key Supplier or Contractor Personnel 9 3.7. Length of Time Bid Is Valid 9 3.8. List of Bid Document Addenda Reviewed by Bidder 9 3.9. Notice of Conflicts or Errors in Bid Documents 9 3.10. Clarifications of Bids 10 3.11. Bidder Signature 10 4. SPECIFICATIONS AND DRAWINGS 10 5. SPECIAL CONDITIONS 10 6. GENERAL CONDITIONS AND CONTRACT AGREEMENTS 11 Appendix A 12 Appendix B 13 Supplier/Bidder List 13 http://www.rfpdb.com/ http://www.imcconstruction.com/general_contractor_landing/construction_manager.php?gclid=CMaD753QurICFUJx4AodulgAkghttp://www.state.nj.us/treasury/purchase/bid/summary/13x22704.shtml 1. INSTRUCTIONS TO BIDDERS Enterprise is seeking proposals from small businesses and large businesses from......

Words: 902 - Pages: 4

Rfp Response to a Proposal

...Response to Expression of Interest To provide office space in Atlanta Metro Area PROJ598 – 22 April 2013 Submitted to: William B. Jones, Leasing Specialist Solicitation Number: 3GA0233 Submitted by: William B. Jones 11330 Lakefield Drive Building Two, Suite 200 Atlanta, GA 30097 Telephone: (770) 814-4466 Fax: (866) 251-892 Email: joneswil@oriis.com Table of Contents 1. SUMMARY OF PROPOSAL 3 1.1. Company Safety Program 3 1.2 Company background and relevant experience with Government Real Estate Acquisition 4 1.3. Report capabilities 4 1.4. References 4 1.5. Financial Information 4 2. Response to scope 4 3. Proposed Pricing 5 4. Other 6 4.1. Building requirement 6 4.2. Building location 6 4.3. Lease 6 4.4. Flood plain 6 4.5. Remaining issues 6 Attachments: Building location 7 Lease 16 1. Summary of proposal Office, Retail, Industrial & Investment Sales, LLC, is pleased to offer our bid to provide office space to the General Service Administration (GSA) in the Atlanta Metro area, Solicitation number: 3GA0233.. William Jones is Co-Owner and Principal Office, Retail, Industrial & Investment Sales, LLC, and has been involved in the commercial real estate industry......

Words: 2413 - Pages: 10

What Is a Rfp

...How to Write an RFP for e-Learning Services Including a Customizable RFP Template What is an RFP? How can you narrow the list of possibilities before contracting for services? How can you ensure that your organization’s business needs will be met? One solution is to write and distribute a Request for Proposal (RFP) in the marketplace. An RFP is a document produced by a company seeking goods and/or services and distributed to prospective vendors. Vendors then provide proposals based on the criteria specified within the RFP. A well-written RFP will outline specific information about your organization, the services and products you need, and the specific requirements suppliers must meet in order to win your business. It forces your to identify your business and technical requirements. It also forces the vendor to state in writing to what extent they can meet your requirements. A written RFP increases market awareness of your organization’s needs, thereby increasing the competition to serve those needs and increasing the formality of the relationship between you and the supplier. In short, an RFP places you—the buyer—in control of the desired service levels and related requirements and lets potential vendors know up front that your most important concern is the level of customer service you will receive. Reasons to Write a Formal Request for Proposal • To increase competition for your organization’s money, which will increase the options and potentially could drive......

Words: 4470 - Pages: 18

It Rfp

...IS4799: Unit 1 Common RFP Sections The common sections of an RFP are:  Introduction: The Introduction section of an RFP states the purpose, scope, and necessary background information about the RFP. The introduction sets the stage for the RFP and summarizes its main points. Each RFP introduction is different and contains information that is specific to that RFP. Many RFPs contain general information that is common, including the following: • Statement of purpose: The statement of purpose summarizes the intent and purpose of the RFP and briefly conveys its reasons for its existence. While it does not contain many performance requirements, this section provides a very general overview of the RFP. The statement of purpose is deliberately high-level and provides few details. • Scope: Readers should gain a general sense of the performance requirements of the RFP from this section. The scope defines the specific products, services, period, terms, and conditions of the RFP. In many RFPs, the scope section simply refers readers to appropriate appendices for more detailed coverage. • Compliance stipulations : The introduction often contains any general compliance stipulations that apply to the RFP process, including vendor selection and performance of the proposal contents. W hile government-related RFPs usually contain statements of compliance with equal opportunity and disability regulations, any other mandatory compliance requirements will be......

Words: 707 - Pages: 3

Proj 410 Week 3 Rfp Evaluations Discussion Questions 2

...PROJ 410 Week 3 RFP Evaluations Discussion Questions 2 http://homeworkfy.com/downloads/proj-410-week-3-rfp-evaluations-discussion-questions-2/ To Get this Tutorial Copy & Paste above URL Into Your Browser Hit Us Email for Any Inquiry at: Homeworkfy@gmail.com Visit our Site for More Tutorials: (http://homeworkfy.com/ ) RFP Evaluations (graded) It is very common to find buyers who fail to identify the RFP evaluation criteria during the project procurement planning process, and in fact, do not define the evaluation criteria until after proposals have been received and the evaluation process is set to begin. What do you think is the risk of waiting until bids have been received to establish the evaluation criteria to be used to select a preferred contractor? Besides evaluating the risk of waiting until bids are submitted, also consider the question from the potential vendors’ point of view. Should vendors be aware of the evaluation criteria during the procurement phase, or after they have submitted their proposals/bids? Finding buyers that fail to identify the RFP evaluation criteria during the project procurement planning process would hurt schedule and scope. Besides, if you get the proposals and read them before you create evaluation criteria, you run the risk of consciously or subconsciously creating evaluation criteria based on what you’ve read which could create a bias towards one of the proposals. Finally, without having your criteria set ahead of time,...

Words: 469 - Pages: 2

Leg 505 Week 6 Assignment 3 – Draft Compliance Matrix and Compliant Proposal to Rfp

...LEG 505 Week 6 Assignment 3 – Draft Compliance Matrix and Compliant Proposal to RFP Click Link Below To Buy: http://hwcampus.com/shop/leg-505/leg-505-week-6-assignment-3-draft-compliance-matrix-and-compliant-proposal-to-rfp/ Or Visit www.hwcampus.com LEG 505 Week 6 Assignment 3 – Draft Compliance Matrix and Compliant Proposal to RFP Week 6 – Points 200 Refer to the following resources to complete this assignment:
• FAR § 15.2 (Solicitation and Receipt of Proposals and Information) (http://www.acquisition.gov/far/current/html/Subpart%2015_2.html)
As the Contract Officer (CO) of your newly formed company, you will create a compliance matrix, and then draft a proposal in response to the RFP from Assignment 2. Write a (5-7) page Compliance Matrix and Compliant Proposal to your RFP paper in which you: 1. Create a compliance matrix and prepare a FAR-compliant proposal in response to the RFP from Assignment 2. Note: You may create and /or assume all necessary assumptions needed for the completion of this assignment. 2. Apply the appropriate FAR clauses in order to meet compliance in contract formulation and award. 3. Apply the knowledge gained from your analysis of Government Accountability Office reports / decisions to identify and account for FAR compliance issues and contributing factors. 4. Apply the knowledge of planned actions in soliciting and awarding contracts and make recommendations to ensure the government agency is in compliance with the......

Words: 336 - Pages: 2

Leg 505 Week 6 Assignment 3 – Draft Compliance Matrix and Compliant Proposal to Rfp

...LEG 505 Week 6 Assignment 3 – Draft Compliance Matrix and Compliant Proposal to RFP Click Link Below To Buy: http://hwcampus.com/shop/leg-505/leg-505-week-6-assignment-3-draft-compliance-matrix-and-compliant-proposal-to-rfp/ Or Visit www.hwcampus.com LEG 505 Week 6 Assignment 3 – Draft Compliance Matrix and Compliant Proposal to RFP Week 6 – Points 200 Refer to the following resources to complete this assignment:
• FAR § 15.2 (Solicitation and Receipt of Proposals and Information) (http://www.acquisition.gov/far/current/html/Subpart%2015_2.html)
As the Contract Officer (CO) of your newly formed company, you will create a compliance matrix, and then draft a proposal in response to the RFP from Assignment 2. Write a (5-7) page Compliance Matrix and Compliant Proposal to your RFP paper in which you: 1. Create a compliance matrix and prepare a FAR-compliant proposal in response to the RFP from Assignment 2. Note: You may create and /or assume all necessary assumptions needed for the completion of this assignment. 2. Apply the appropriate FAR clauses in order to meet compliance in contract formulation and award. 3. Apply the knowledge gained from your analysis of Government Accountability Office reports / decisions to identify and account for FAR compliance issues and contributing factors. 4. Apply the knowledge of planned actions in soliciting and awarding contracts and make recommendations to ensure the government agency is in compliance with the......

Words: 336 - Pages: 2

Bus 505 Assignment 3 – Rfp Response

...http://www.fbo.gov 3. Provide the firm’s current strategies and then assess the strategic success using financial figures or “soft” indicators as the background. 4. Develop a SWOT analysis (use a table) for the business to determine the internal and external factors in servicing the federal government and then provide a gap analysis (using the weaknesses and threats) in satisfying the expected requirements. 5. Using the federal procurement process, create an action plan to fulfill the expected requirements based off the gap analysis. 6. Use at least three (3) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources BUS 505 Assignment 2 – Bid Strategy Provide a bid strategy using the same firm and scenario from the first assignment. Write a three to five (3-5) page paper in which you: 1. Review the action plan from the first assignment and create a future plan that is consistent with federal procurement opportunity’s mission or strategic plan. 2. Create a bid decision evaluation form, select a total of five (5) criteria of the firm’s current marketing position, and then score against the requested opportunity using the example on Figure 7.1 described in Chapter 7 of the textbook. 3. Develop a bid strategy that provides a competitive edge over the peer federal acquisition market using five (5) customer key evaluation requirements (CKERs). 4. Identify three (3) risks of the bid strategy and then develop three......

Words: 652 - Pages: 3

Leg 505 Week 6 Assignment 3 – Draft Compliance Matrix and Compliant Proposal to Rfp

...LEG 505 Week 6 Assignment 3 – Draft Compliance Matrix and Compliant Proposal to RFP Click Link Below To Buy: http://hwcampus.com/shop/leg-505/leg-505-week-6-assignment-3-draft-compliance-matrix-and-compliant-proposal-to-rfp/ Or Visit www.hwcampus.com LEG 505 Week 6 Assignment 3 – Draft Compliance Matrix and Compliant Proposal to RFP Week 6 – Points 200 Refer to the following resources to complete this assignment:
• FAR § 15.2 (Solicitation and Receipt of Proposals and Information) (http://www.acquisition.gov/far/current/html/Subpart%2015_2.html)
As the Contract Officer (CO) of your newly formed company, you will create a compliance matrix, and then draft a proposal in response to the RFP from Assignment 2. Write a (5-7) page Compliance Matrix and Compliant Proposal to your RFP paper in which you: 1. Create a compliance matrix and prepare a FAR-compliant proposal in response to the RFP from Assignment 2. Note: You may create and /or assume all necessary assumptions needed for the completion of this assignment. 2. Apply the appropriate FAR clauses in order to meet compliance in contract formulation and award. 3. Apply the knowledge gained from your analysis of Government Accountability Office reports / decisions to identify and account for FAR compliance issues and contributing factors. 4. Apply the knowledge of planned actions in soliciting and awarding contracts and make recommendations to ensure the government agency is in compliance with the......

Words: 336 - Pages: 2

Proj598-Week-3-Quiz1

...verification (was the work completed correctly?) and administrative closeout (updating and archiving of records). Early termination is a special case of contract closure and can result from a mutual decision, from default by one of the parties, or for convenience of the buyer. The rights of the parties should be defined in a terminations clause in the contract. The buyer provides formal, written notice that the contract has been completed. |   | Instructor Explanation: | See the PMBOK® Guide, Chapter 12.Plan procurements  Conduct procurements Control procurements Closeout procurements    Students must list and explain what occurs in each process. | | |   | Points Received: | 30 of 30 |   | Comments: | | | | Question 3. | Question : | (TCO C) Compare and contrast a firm fixed-price contract with a cost-plus contract. When would each be appropriate for a given project? | |   | Student Answer: |   | Fixed price means that a price has been set for goods or services, and in most circumstances no bargaining is permitted over that price. The price is held constant regardless of the cost of production. Cost plus pricing, often used in government contracts, refers to a contract where the price is based upon the actual cost of production and any agreed upon rates of profit or fees. Businesses use one of two established methods for calculating cost plus prices. Each model carries inherent risks and rewards for buyers and sellers. Fixed price is generally......

Words: 1426 - Pages: 6

Leg 505 Week 6 Assignment 3 – Draft Compliance Matrix and Compliant Proposal to Rfp

...LEG 505 Week 6 Assignment 3 – Draft Compliance Matrix and Compliant Proposal to RFP Click Link Below To Buy: http://hwcampus.com/shop/leg-505/leg-505-week-6-assignment-3-draft-compliance-matrix-and-compliant-proposal-to-rfp/ Or Visit www.hwcampus.com LEG 505 Week 6 Assignment 3 – Draft Compliance Matrix and Compliant Proposal to RFP Week 6 – Points 200 Refer to the following resources to complete this assignment:
• FAR § 15.2 (Solicitation and Receipt of Proposals and Information) (http://www.acquisition.gov/far/current/html/Subpart%2015_2.html)
As the Contract Officer (CO) of your newly formed company, you will create a compliance matrix, and then draft a proposal in response to the RFP from Assignment 2. Write a (5-7) page Compliance Matrix and Compliant Proposal to your RFP paper in which you: 1. Create a compliance matrix and prepare a FAR-compliant proposal in response to the RFP from Assignment 2. Note: You may create and /or assume all necessary assumptions needed for the completion of this assignment. 2. Apply the appropriate FAR clauses in order to meet compliance in contract formulation and award. 3. Apply the knowledge gained from your analysis of Government Accountability Office reports / decisions to identify and account for FAR compliance issues and contributing factors. 4. Apply the knowledge of planned actions in soliciting and awarding contracts and make recommendations to ensure the government agency is in compliance with the......

Words: 336 - Pages: 2

Leg 505 Week 6 Assignment 3 – Draft Compliance Matrix and Compliant Proposal to Rfp

...LEG 505 Week 6 Assignment 3 – Draft Compliance Matrix and Compliant Proposal to RFP Click Link Below To Buy: http://hwcampus.com/shop/leg-505/leg-505-week-6-assignment-3-draft-compliance-matrix-and-compliant-proposal-to-rfp/ Or Visit www.hwcampus.com LEG 505 Week 6 Assignment 3 – Draft Compliance Matrix and Compliant Proposal to RFP Week 6 – Points 200 Refer to the following resources to complete this assignment:
• FAR § 15.2 (Solicitation and Receipt of Proposals and Information) (http://www.acquisition.gov/far/current/html/Subpart%2015_2.html)
As the Contract Officer (CO) of your newly formed company, you will create a compliance matrix, and then draft a proposal in response to the RFP from Assignment 2. Write a (5-7) page Compliance Matrix and Compliant Proposal to your RFP paper in which you: 1. Create a compliance matrix and prepare a FAR-compliant proposal in response to the RFP from Assignment 2. Note: You may create and /or assume all necessary assumptions needed for the completion of this assignment. 2. Apply the appropriate FAR clauses in order to meet compliance in contract formulation and award. 3. Apply the knowledge gained from your analysis of Government Accountability Office reports / decisions to identify and account for FAR compliance issues and contributing factors. 4. Apply the knowledge of planned actions in soliciting and awarding contracts and make recommendations to ensure the government agency is in compliance with the......

Words: 336 - Pages: 2

Leg 505 Week 6 Assignment 3 – Draft Compliance Matrix and Compliant Proposal to Rfp

...LEG 505 Week 6 Assignment 3 – Draft Compliance Matrix and Compliant Proposal to RFP Click Link Below To Buy: http://hwcampus.com/shop/leg-505/leg-505-week-6-assignment-3-draft-compliance-matrix-and-compliant-proposal-to-rfp/ Or Visit www.hwcampus.com LEG 505 Week 6 Assignment 3 – Draft Compliance Matrix and Compliant Proposal to RFP Week 6 – Points 200 Refer to the following resources to complete this assignment:
• FAR § 15.2 (Solicitation and Receipt of Proposals and Information) (http://www.acquisition.gov/far/current/html/Subpart%2015_2.html)
As the Contract Officer (CO) of your newly formed company, you will create a compliance matrix, and then draft a proposal in response to the RFP from Assignment 2. Write a (5-7) page Compliance Matrix and Compliant Proposal to your RFP paper in which you: 1. Create a compliance matrix and prepare a FAR-compliant proposal in response to the RFP from Assignment 2. Note: You may create and /or assume all necessary assumptions needed for the completion of this assignment. 2. Apply the appropriate FAR clauses in order to meet compliance in contract formulation and award. 3. Apply the knowledge gained from your analysis of Government Accountability Office reports / decisions to identify and account for FAR compliance issues and contributing factors. 4. Apply the knowledge of planned actions in soliciting and awarding contracts and make recommendations to ensure the government agency is in compliance with the......

Words: 336 - Pages: 2

Bus 505 Assignment 3 Rfp Response

...BUS 505 ASSIGNMENT 3 RFP RESPONSE TO purchase this tutorial visit following link: http://wiseamerican.us/product/bus-505-assignment-3-rfp-response/ Contact us at: SUPPORT@WISEAMERICAN.US BUS 505 ASSIGNMENT 3 RFP RESPONSE Respond to a RFP using the same firm and scenario from the first and second assignments. Write a four to six (4-6) page paper in which you: 1. Review the firm’s organizational structure and then develop a matrix of five (5) roles, responsibilities, and authority for the key members of the captured team to execute the proposal. 2. Read the RFP and then provide the method the company will use to respond to the RFP ambiguity by using a competitive advantage approach. 3. Create a proposal requirement document using Figure 9.1 as an example. 4. Use at least three (3) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources BUS 505 ASSIGNMENT 3 RFP RESPONSE Respond to a RFP using the same firm and scenario from the first and second assignments. Write a four to six (4-6) page paper in which you: 1. Review the firm’s organizational structure and then develop a matrix of five (5) roles, responsibilities, and authority for the key members of the captured team to execute the proposal. 2. Read the RFP and then provide the method the company will use to respond to the RFP ambiguity by using a competitive advantage approach. 3. Create a proposal requirement document using Figure 9.1 as an example. 4.......

Words: 401 - Pages: 2

Rfp Sample

...Request for Proposal Inventory Control System Blooming Tyler’s 123 Flower Street Miramar, FL 12345 Distribution List Samantha Smith (CFO) Lisa Panera (CIO) Alfred First (Marketing) TABLE OF CONTENTS 1. INSTRUCTIONS TO BIDDERS 3 1.1. General Description of Work 3 1.2. What Must Be Included with Bid 3 1.3. Schedule of Bid Period Activities 5 1.4. Location of Work 5 1.5. Pre-Bid Meeting 7 1.6. Owner Contact for questions 7 1.7. Pre-Award Surveys 7 1.8. Sealed Bid Requirements 7 1.9. Basis for Bid Evaluation 7 1.10. Ethical Standards 8 1.11. Responsibility for Surety Bonds 8 1.12. Proposal Format 8 1.13. List of Bidders 8 1.14. Letter of Acknowledgment 8 2. DESCRIPTION OF WORK 8 2.1. Engineering Contracts 9 2.2. Construction Contracts 9 3. PROPOSAL 10 3.1. Breakdown of Bid Price 10 3.2. Revisions and Extra Work 11 3.3. Escalation Formulas 11 3.4. Scheduled Completion Dates 11 3.5. List of Subcontractors 11 3.6. Key Supplier or Contractor Personnel 11 3.7. Length of Time Bid Is Valid 11 3.8. List of Bid Document Addenda Reviewed by Bidder 11 3.9. Notice of Conflicts or Errors in Bid Documents 11 3.10. Clarifications of Bids 11 3.11. Bidder Signature 12 4. SPECIFICATIONS AND DRAWINGS 12 5. SPECIAL CONDITIONS 12 6. GENERAL CONDITIONS AND CONTRACT AGREEMENTS 13 Appendix A 14 Appendix B 15 Supplier/Bidder List 15 Note: Click somewhere within your table of contents, press F9, select the “update entire......

Words: 4574 - Pages: 19