Proj598

In: Business and Management

Submitted By jozinnah123
Words 902
Pages 4
TABLE OF CONTENTS

1. INSTRUCTIONS TO BIDDERS 4
1.1. General Description of Work 4
1.2. What Must Be Included with Bid 4
1.3. Schedule of Bid Period Activities 4
1.4. Location of Work 5
1.5. Pre-Bid Meeting 5
1.6. Owner Contact for Questions 5
1.7. Pre-Award Surveys 5
1.8. Sealed Bid Requirements 5
1.9. Basis for Bid Evaluation 6
1.10. Ethical Standards 6
1.11. Responsibility for Surety Bonds 6
1.12. Proposal Format 6
1.13. List of Bidders 6
1.14. Letter of Acknowledgment 6
2. DESCRIPTION OF WORK 7
2.1. Engineering Contracts 7
2.2. Construction Contracts 8
3. PROPOSAL 8
3.1. Breakdown of Bid Price 9
3.2. Revisions and Extra Work 9
3.3. Escalation Formulas 9
3.4. Scheduled Completion Dates 9
3.5. List of Subcontractors 9
3.6. Key Supplier or Contractor Personnel 9
3.7. Length of Time Bid Is Valid 9
3.8. List of Bid Document Addenda Reviewed by Bidder 9
3.9. Notice of Conflicts or Errors in Bid Documents 9
3.10. Clarifications of Bids 10
3.11. Bidder Signature 10
4. SPECIFICATIONS AND DRAWINGS 10
5. SPECIAL CONDITIONS 10
6. GENERAL CONDITIONS AND CONTRACT AGREEMENTS 11
Appendix A 12
Appendix B 13
Supplier/Bidder List 13

http://www.rfpdb.com/ http://www.imcconstruction.com/general_contractor_landing/construction_manager.php?gclid=CMaD753QurICFUJx4AodulgAkghttp://www.state.nj.us/treasury/purchase/bid/summary/13x22704.shtml 1. INSTRUCTIONS TO BIDDERS
Enterprise is seeking proposals from small businesses and large businesses from commercial construction contracting organizations that have the capability to design and construct a baseball practice field, clubhouse and parking area.
.
1.1. General Description of Work
The semipro baseball project will include but not limited to the demolition of few dilapidated barns, clearing of the land for construction, the construction of small clubhouse, and a parking area that holds…...

Similar Documents

Copier Confused

...PROJ598 – Contract and Procurement Management Copier Confusion The Business Company, Inc., badly needed new copying machines. The company had 20 machines, but they were old and copy quality was poor. They broke down frequently. And to change paper size from 8.5 x 11 in. to legal-size, the user had to remove one paper tray containing 8.5 x 11 in. paper and replace it with a tray containing legal-size paper. Newer machines had two trays, one for each paper size, that permitted changing paper size at the push of a button without changing paper trays. John Richards, the company’s purchasing agent, thought this would be a labor-saving feature and decided to include it in a specification for purchase of new machines. The copying machine industry called this feature, “dual-cassette” design. The Business Company issued an invitation for bids for purchase and maintenance of 20 replacement machines. The solicitation included a specification that called for a machine that would permit “copying both 8.5 x 11 in. and legal-size paper without manually changing the paper trays.” The term dual cassette did not appear in the specification. John received bids from several companies, including Copies Incorporated, a reputable manufacturer. Copiers had greeted the invitation for bids with great pleasure. Their inventory included 30 of their Model 125 copying machines, which they were phasing out. The Model 125 had only one tray, which held 8.5 x 11 in. and legal-size paper, but legal-size......

Words: 971 - Pages: 4

Proj598 Rfp 3

...Hotel Rooms for FESAC Meeting for U.S. Census Bureau A proposal by DC Hotel and Suites Solicitation #: CENSUS_VLT-13-HOTEL Contract Award Date: April 18, 2013 April 14, 2013 DC Hotel & Suites 1291 Alabama Avenue SE Washington, District of Columbia 20233 +1 301 555 5555 Prepared by: Jennifer Mitchell jennifer.mitchell@dchotel.com DC Hotel & Suites 1291 Alabama Avenue SE Washington, District of Columbia 20233 April 14, 2013 Victor Levi Thomas Contract Specialist U.S. Census Bureau 4600 Silver Hill Road Suitland, Maryland 20746 Dear Mr. Thomas: Attached is our bid for the Hotel Rooms for FESAC Meeting, Solicitation Number: CENSUS_VLT-13-HOTEL. This bid assumes that if granted all necessary arrangements will be made no later than 30 days prior to the FESAC meeting. This bid is also based on information provided at this time. Any revisions required at a later date will be subject to price review at that time. If there is anything you have questions about please contact me any time. Thank you for giving us this opportunity. We look forward to hearing from you. Sincerely, Jennifer Mitchell Hotel Manager Enclosure Contents Technical Approach 4 Introduction 4 General Description 4 Capacity 4 Goals 4 Description 4 Cost 5 Other Amenities 5 Personnel Qualifications 6 References 7 Team Partners 8 Capabilities and Partner Capabilities 8 Works Cited 10 Technical Approach Introduction DC Hotel & Suites is the...

Words: 1306 - Pages: 6

Inventory Control System

...Request for Proposal An Inventory Control System Knox’s Catalog 0701 Knox Lane Crest Hill Il.60403 815 919-3300 Andie Knox godlorddivine@yahoo.com PROJ598 – September 2013 TABLE OF CONTENTS 1.5. Pre-Bid Meeting 7 1.6. Owner Contact for Questions 8 1.7. Pre-Award Surveys 1.8. Sealed Bid Requirements 10 1.9. Basis for Bid Evaluation 11 1.10. Ethical Standards 11 1.11. Responsibility for Surety Bonds 11 1.12. Proposal Format 11 1.13. List of Bidders 11 1.14. Letter of Acknowledgment 11 2. DESCRIPTION OF WORK 12 2.1. Engineering Contracts 12 2.2. Construction Contracts 13 3. PROPOSAL 13 3.1. Breakdown of Bid Price 14 3.2. Revisions and Extra Work 14 3.3. Escalation Formulas 14 3.4. Scheduled Completion Dates 14 3.5. List of Subcontractors 14 3.6. Key Supplier or Contractor Personnel 14 3.7. Length of Time Bid Is Valid 14 3.8. List of Bid Document Addenda Reviewed by Bidder 14 3.9. Notice of Conflicts or Errors in Bid Documents 14 3.10. Clarifications of Bids 15 3.11. Bidder Signature 15 4. SPECIFICATIONS AND DRAWINGS 15 5. SPECIAL CONDITIONS 15 6. GENERAL CONDITIONS AND CONTRACT AGREEMENTS 16 Appendix A 17 Appendix B 18 1.5 Pre – Bid Meeting The Bidder’s Conference will take place on 29 August, 2013, beginning at 9:00am at the Holiday Inn Hotel in Joliet IL. Please be in place at 08:30am in the main hotel conference room prior to 9:00am for prompt conference start. Pre-bid conferences will be good an opportunity to ensure proper understanding of......

Words: 579 - Pages: 3

Proj 598 Full Course Project

...here http://devrycourse.com/proj-598-full-course-project Product Description The course project for PROJ598 consists of three parts, which provide familiarization to processes associated with contract and procurement management. • Part 1 (PP1) of the Course Project focuses on the first section of the RFP and entails selecting one of the three RFP procurement cases listed under the PP1 section and using the PP1&2 - Course Project RFP template document in the Doc Sharing area to develop information to support section one of the RFP. • Part 1 (PP2) of the Course Project entails completing the remaining sections of the RFP by developing a comprehensive document that could be submitted to a vendor. • Part 3 (PP3) covers all of the TCOs but touches mainly upon textbook Chapters 9 through 12. You will be required to identify an opportunity through http://www.Fbo.gov and follow the instructions, which are located in the Doc Sharing section. This three-part project provides an overview of the processes and material that are used to develop a RFP as well as address relevant questions that could result from contract and procurement management. PROJ 598 Full Course Project Purchase here http://devrycourse.com/proj-598-full-course-project Product Description The course project for PROJ598 consists of three parts, which provide familiarization to processes associated with contract and procurement......

Words: 389 - Pages: 2

Proj 598 Full Course Project

...here http://devrycourse.com/proj-598-full-course-project Product Description The course project for PROJ598 consists of three parts, which provide familiarization to processes associated with contract and procurement management. • Part 1 (PP1) of the Course Project focuses on the first section of the RFP and entails selecting one of the three RFP procurement cases listed under the PP1 section and using the PP1&2 - Course Project RFP template document in the Doc Sharing area to develop information to support section one of the RFP. • Part 1 (PP2) of the Course Project entails completing the remaining sections of the RFP by developing a comprehensive document that could be submitted to a vendor. • Part 3 (PP3) covers all of the TCOs but touches mainly upon textbook Chapters 9 through 12. You will be required to identify an opportunity through http://www.Fbo.gov and follow the instructions, which are located in the Doc Sharing section. This three-part project provides an overview of the processes and material that are used to develop a RFP as well as address relevant questions that could result from contract and procurement management. PROJ 598 Full Course Project Purchase here http://devrycourse.com/proj-598-full-course-project Product Description The course project for PROJ598 consists of three parts, which provide familiarization to processes associated with contract and procurement......

Words: 777 - Pages: 4

Roj 598 Full Course Project P

...here http://devrycourse.com/proj-598-full-course-project Product Description The course project for PROJ598 consists of three parts, which provide familiarization to processes associated with contract and procurement management. • Part 1 (PP1) of the Course Project focuses on the first section of the RFP and entails selecting one of the three RFP procurement cases listed under the PP1 section and using the PP1&2 - Course Project RFP template document in the Doc Sharing area to develop information to support section one of the RFP. • Part 1 (PP2) of the Course Project entails completing the remaining sections of the RFP by developing a comprehensive document that could be submitted to a vendor. • Part 3 (PP3) covers all of the TCOs but touches mainly upon textbook Chapters 9 through 12. You will be required to identify an opportunity through http://www.Fbo.gov and follow the instructions, which are located in the Doc Sharing section. This three-part project provides an overview of the processes and material that are used to develop a RFP as well as address relevant questions that could result from contract and procurement management. ROJ 598 Full Course Project P Purchase here http://devrycourse.com/proj-598-full-course-project Product Description The course project for PROJ598 consists of three parts, which provide familiarization to processes associated with contract and procurement......

Words: 391 - Pages: 2

Proj 598 Full Course Project

...here http://devrycourse.com/proj-598-full-course-project Product Description The course project for PROJ598 consists of three parts, which provide familiarization to processes associated with contract and procurement management. • Part 1 (PP1) of the Course Project focuses on the first section of the RFP and entails selecting one of the three RFP procurement cases listed under the PP1 section and using the PP1&2 - Course Project RFP template document in the Doc Sharing area to develop information to support section one of the RFP. • Part 1 (PP2) of the Course Project entails completing the remaining sections of the RFP by developing a comprehensive document that could be submitted to a vendor. • Part 3 (PP3) covers all of the TCOs but touches mainly upon textbook Chapters 9 through 12. You will be required to identify an opportunity through http://www.Fbo.gov and follow the instructions, which are located in the Doc Sharing section. This three-part project provides an overview of the processes and material that are used to develop a RFP as well as address relevant questions that could result from contract and procurement management. PROJ 598 Full Course Project Purchase here http://devrycourse.com/proj-598-full-course-project Product Description The course project for PROJ598 consists of three parts, which provide familiarization to processes associated with contract and procurement......

Words: 389 - Pages: 2

Proj 598 Full Course Project

...http://chosecourses.com/PROJ%20598/proj-598-full-course-project Product Description The course project for PROJ598 consists of three parts, which provide familiarization to processes associated with contract and procurement management. • Part 1 (PP1) of the Course Project focuses on the first section of the RFP and entails selecting one of the three RFP procurement cases listed under the PP1 section and using the PP1&2 - Course Project RFP template document in the Doc Sharing area to develop information to support section one of the RFP. • Part 1 (PP2) of the Course Project entails completing the remaining sections of the RFP by developing a comprehensive document that could be submitted to a vendor. • Part 3 (PP3) covers all of the TCOs but touches mainly upon textbook Chapters 9 through 12. You will be required to identify an opportunity through http://www.Fbo.gov and follow the instructions, which are located in the Doc Sharing section. This three-part project provides an overview of the processes and material that are used to develop a RFP as well as address relevant questions that could result from contract and procurement management. PROJ 598 Full Course Project Purchase here http://chosecourses.com/PROJ%20598/proj-598-full-course-project Product Description The course project for PROJ598 consists of three parts, which provide familiarization to processes associated with contract......

Words: 1177 - Pages: 5

Proj 598 Full Course Project

...http://chosecourses.com/PROJ%20598/proj-598-full-course-project Product Description The course project for PROJ598 consists of three parts, which provide familiarization to processes associated with contract and procurement management. • Part 1 (PP1) of the Course Project focuses on the first section of the RFP and entails selecting one of the three RFP procurement cases listed under the PP1 section and using the PP1&2 - Course Project RFP template document in the Doc Sharing area to develop information to support section one of the RFP. • Part 1 (PP2) of the Course Project entails completing the remaining sections of the RFP by developing a comprehensive document that could be submitted to a vendor. • Part 3 (PP3) covers all of the TCOs but touches mainly upon textbook Chapters 9 through 12. You will be required to identify an opportunity through http://www.Fbo.gov and follow the instructions, which are located in the Doc Sharing section. This three-part project provides an overview of the processes and material that are used to develop a RFP as well as address relevant questions that could result from contract and procurement management. PROJ 598 Full Course Project Purchase here http://chosecourses.com/PROJ%20598/proj-598-full-course-project Product Description The course project for PROJ598 consists of three parts, which provide familiarization to processes associated with contract......

Words: 393 - Pages: 2

Proj 598 Full Course Project

...PROJ 598 FULL COURSE PROJECT To purchase this visit following link: http://www.activitymode.com/product/proj-598-full-course-project/ Contact us at: SUPPORT@ACTIVITYMODE.COM PROJ 598 FULL COURSE PROJECT PROJ 598 Full Course Project The course project for PROJ598 consists of three parts, which provide familiarization to processes associated with contract and procurement management. • Part 1 (PP1) of the Course Project focuses on the first section of the RFP and entails selecting one of the three RFP procurement cases listed under the PP1 section and using the PP1&2 – Course Project RFP template document in the Doc Sharing area to develop information to support section one of the RFP. • Part 1 (PP2) of the Course Project entails completing the remaining sections of the RFP by developing a comprehensive document that could be submitted to a vendor. • Part 3 (PP3) covers all of the TCOs but touches mainly upon textbook Chapters 9 through 12. You will be required to identify an opportunity through http://www.Fbo.gov and follow the instructions, which are located in the Doc Sharing section. This three-part project provides an overview of the processes and material that are used to develop a RFP as well as address relevant questions that could result from contract and procurement management. Activity mode aims to provide quality study notes and tutorials to the students of PROJ 598 Full Course Project in order to ace their studies. PROJ 598...

Words: 1196 - Pages: 5

Proj 598 Full Course Project

...http://chosecourses.com/PROJ%20598/proj-598-full-course-project Product Description The course project for PROJ598 consists of three parts, which provide familiarization to processes associated with contract and procurement management. • Part 1 (PP1) of the Course Project focuses on the first section of the RFP and entails selecting one of the three RFP procurement cases listed under the PP1 section and using the PP1&2 - Course Project RFP template document in the Doc Sharing area to develop information to support section one of the RFP. • Part 1 (PP2) of the Course Project entails completing the remaining sections of the RFP by developing a comprehensive document that could be submitted to a vendor. • Part 3 (PP3) covers all of the TCOs but touches mainly upon textbook Chapters 9 through 12. You will be required to identify an opportunity through http://www.Fbo.gov and follow the instructions, which are located in the Doc Sharing section. This three-part project provides an overview of the processes and material that are used to develop a RFP as well as address relevant questions that could result from contract and procurement management. PROJ 598 Full Course Project Purchase here http://chosecourses.com/PROJ%20598/proj-598-full-course-project Product Description The course project for PROJ598 consists of three parts, which provide familiarization to processes associated with contract......

Words: 1373 - Pages: 6

Proj 598 Full Course Project

...http://chosecourses.com/PROJ%20598/proj-598-full-course-project Product Description The course project for PROJ598 consists of three parts, which provide familiarization to processes associated with contract and procurement management. • Part 1 (PP1) of the Course Project focuses on the first section of the RFP and entails selecting one of the three RFP procurement cases listed under the PP1 section and using the PP1&2 - Course Project RFP template document in the Doc Sharing area to develop information to support section one of the RFP. • Part 1 (PP2) of the Course Project entails completing the remaining sections of the RFP by developing a comprehensive document that could be submitted to a vendor. • Part 3 (PP3) covers all of the TCOs but touches mainly upon textbook Chapters 9 through 12. You will be required to identify an opportunity through http://www.Fbo.gov and follow the instructions, which are located in the Doc Sharing section. This three-part project provides an overview of the processes and material that are used to develop a RFP as well as address relevant questions that could result from contract and procurement management. PROJ 598 Full Course Project Purchase here http://chosecourses.com/PROJ%20598/proj-598-full-course-project Product Description The course project for PROJ598 consists of three parts, which provide familiarization to processes associated with contract......

Words: 785 - Pages: 4

Proj598-Week-3-Quiz1

... 1. | Question : | (TCO B) All of the below would be considered good selection criteria for a buyer to use to select a seller, except | |   | Student Answer: | |  proprietary rights of buyer, overall cost, and warrantee offered by seller. |   | | |  past work done by seller, intellectual property rights, and risk associated with a given seller. |   | | |  technical capability of seller, understanding of work by seller, and business type of seller. |   | | |  managerial approach of seller, capacity of seller to do the work, and ability of seller to make a reasonable make-or-buy decision. |   | Instructor Explanation: | PMBOK® Guide, Chapter 12 | | |   | Points Received: | 10 of 10 |   | Comments: | | | | Question 2. | Question : | (TCO A) In industry, there are four processes one follows in the procurement area of project management. Describe and explain these four processes in the procurement management process for the buyer. | |   | Student Answer: |   | There are four processes in procurement management; plan, conduct, administer, and close procurement. Plan Procurement Process of documenting project purchasing decision, specifying the approach and identifying potential sellers. The first out of four procurement-related project management processes is in the Planning Process group, and is the process which creates the guidelines for all of the procurement activities on the project. It helps document the project procurement......

Words: 1426 - Pages: 6

Proj 598 Full Course Project

...here http://devrycourse.com/proj-598-full-course-project Product Description The course project for PROJ598 consists of three parts, which provide familiarization to processes associated with contract and procurement management. • Part 1 (PP1) of the Course Project focuses on the first section of the RFP and entails selecting one of the three RFP procurement cases listed under the PP1 section and using the PP1&2 - Course Project RFP template document in the Doc Sharing area to develop information to support section one of the RFP. • Part 1 (PP2) of the Course Project entails completing the remaining sections of the RFP by developing a comprehensive document that could be submitted to a vendor. • Part 3 (PP3) covers all of the TCOs but touches mainly upon textbook Chapters 9 through 12. You will be required to identify an opportunity through http://www.Fbo.gov and follow the instructions, which are located in the Doc Sharing section. This three-part project provides an overview of the processes and material that are used to develop a RFP as well as address relevant questions that could result from contract and procurement management. PROJ 598 Full Course Project Purchase here http://devrycourse.com/proj-598-full-course-project Product Description The course project for PROJ598 consists of three parts, which provide familiarization to processes associated with contract and procurement......

Words: 1553 - Pages: 7

Proj 598 Full Course Project

...tutorial visit following link http://wiseamerican.us/product/proj-598-full-course-project/ Contact us at: SUPPORT@WISEAMERICAN.US PROJ 598 FULL COURSE PROJECT The course project for PROJ598 consists of three parts, which provide familiarization to processes associated with contract and procurement management. • Part 1 (PP1) of the Course Project focuses on the first section of the RFP and entails selecting one of the three RFP procurement cases listed under the PP1 section and using the PP1&2 – Course Project RFP template document in the Doc Sharing area to develop information to support section one of the RFP. • Part 1 (PP2) of the Course Project entails completing the remaining sections of the RFP by developing a comprehensive document that could be submitted to a vendor. • Part 3 (PP3) covers all of the TCOs but touches mainly upon textbook Chapters 9 through 12. You will be required to identify an opportunity through http://www.Fbo.gov and follow the instructions, which are located in the Doc Sharing section. This three-part project provides an overview of the processes and material that are used to develop a RFP as well as address relevant questions that could result from contract and procurement management. PROJ 598 FULL COURSE PROJECT The course project for PROJ598 consists of three parts, which provide familiarization to processes associated with contract and procurement management. • Part 1 (PP1) of the Course Project......

Words: 756 - Pages: 4